“Inspiring the World as passionate followers of Jesus Christ so all can experience God’s life giving love.”
We, the Echo Park UMC, are breathing life into our sacred spaces in order to welcome the community. This work has been done with commitments of time, money, and sweat. Please join us in this campaign, in whatever way it speaks to you!
In addition to the major renovations done on the Parsonage (roof, windows, paint, landscape, garage, floors), our church accomplished the following work on the sanctuary. Priorities for Winter and Spring 2015- Create inviting entrances and sanctuary; safety items:
(Alvarado) Paint front door, trim around front door, and attached sign box. Painted all exterior doors with blue paint. DONE
(Reservoir) Tree trimming DONE
(Reservoir) Ramp- fill cracks, power wash, repaint DONE
(Alvarado) Replace damaged side (south) of sign and correct text on north side. DONE
Choir loft: new carpet- safety item. DONE

Sanctuary: SANCTUARY CHAIRS- STRIPPED AND STAINED; SANCTUARY FLOOR- STRIPPED AND STAINED
Touch up wood finish on lecterns, prayer rail, benches DONE
Of the remaining projects, the following items have been isolated as immediate needs:
Priorities for Fall 2015- Prepare for rains; continue safety items; upgrade rental hall
(Alvarado) Power wash & paint front entrance stairs
(Reservoir) Refinish community furniture
Replace broken window over South facing stairwell (cost estimate $500)
(Reservoir) Clean out sub street level window wells
Check sidewalks for dangerous cracks and submit request to City Department
Fellowship Hall: Repair or replace stage curtains (DONE); replace broken tables
Remaining Wishlist:
Exterior:
(Alvarado) replace bulb and/or rewire light fixture in attached sign box
Remove banner facing south hanging from roof- incorrect info
Repaint lettering on both Reservoir and Alvarado
Replace Plexiglas covering over stained glass windows, replace with a clearer Plexiglass
Interior:
Alvarado Entrance foyer: replace carpet, replace lighting fixture, remove old corkboard, clean walls and touch up paint, remove old flowers, put out new information holders
Reservoir Entrance hall: replace carpet, paint door, add interior directional signage (such as directory of offices, signs above entrance to Chapel, Sanctuary, Restrooms)
Choir loft: new chairs, paint out graffiti
Apse: 5 bays- remove brown covers, replace with (???)
Sanctuary: repair cracks and paint Walls; Strip and refinish real wood doors; Polish metal parts on chairs
Church Office: clean out closet, polish floor
Chapel: repaint or replace chairs; replace wood bar with real lock, re-bulb exit sign
Equipment:
Sound system- wireless microphone headset, hanging mic over altar, wire maintenance, better location for sound board
More lighting, such as a reading light on lecterns
New banners (interior and exterior)
Flags- clean flags, polish brass on stands
Signage
Tuning schedule for pianos
Maintenance schedule:
Goal: To develop a schedule of services for paid staff, contracting, and volunteers.
Wax tile floors- quarterly
Shampoo carpets- quarterly
Cleaning of restrooms- daily
Cleaning of kitchens- weekly & after use
Pest control